Comparing quote totals alone can hide differences in the work included. Send the same requirements first, then review costs separately from delivery scope. The questions below are general comparison guidance, not a Prime Solution price list or confirmed contract terms.
1. Use the same requirements brief
Describe the required screens, user roles, languages, operating scale, and preferred schedule in one brief. Separate essential items from later considerations. Record the document and version used for each quote. Do not compare totals as equivalent when their scopes differ.
2. Separate one-time and recurring costs
Put setup and configuration on separate rows from monthly or annual operating charges. Check billing frequency, start conditions, quantities, and currency, then compare costs over the same period. For usage-based items, ask which calculation rules and supporting records apply. Leave unspecified amounts and rates unconfirmed.
3. Mark included, separate, and unconfirmed items
For design changes, translation, data preparation, external integrations, training, and other required work, mark whether each item is included or needs a separate discussion. Ask who defines the additional scope and when its quote will be confirmed. An item missing from a proposal is not automatically free or unavailable.
4. Ask about support using specific situations
Distinguish inquiry intake, technical investigation, user guidance, and additional development. Ask about channels, languages, support hours, and emergency contacts. A Philippines team should state Philippine Time (UTC+08:00) when comparing hours with an overseas support team. Clarify whether initial response targets and resolution targets mean different things.
5. Clarify schedules, acceptance, and change requests
Record what starts the schedule, which materials the customer must supply, the deliverables at each stage, and how acceptance is checked. Ask who explains the cost and timing impact of changed requirements and how that impact is reviewed. Keep the desired completion date separate from the schedule confirmed by the provider.
6. Record open questions and quote validity
Check the issue date, applicable version, validity period, and exclusions. If currencies differ, record the date and source used for comparison conversions while retaining the original quoted amounts and currencies. Do not assume payment terms. Assign an owner and a confirmation deadline to each open question.
A reusable quote comparison record
Use one row per item: item / required scope / included, separate, or unconfirmed / one-time or recurring / billing basis and frequency / currency and quoted amount / support and acceptance conditions / source document and version / open question and owner. Compare items only once the relevant conditions are aligned.
Compare price together with scope
The comparison should reveal differences between the work needed and the terms offered. Confirm actual scope and costs in the individual proposal and agreed terms. External references describe their respective suppliers; they do not establish a Prime Solution partnership or equivalent conditions.
Prepare your requirements and unresolved questions before a consultation so the required scope can be discussed clearly.
Related guide: requirements brief
Related guide: change verification